How to set the minimum price limit in construction contracts

Update date: September 21, 2022

We will inform you that the method of setting the minimum price limit in the contract contract for the construction ordered by Inagi City has been revised as follows.
It will be applied from April 1, 2022 onwards for construction that will be notified of tender announcements or nominations.

Target construction

(1) A construction contract with an estimated price of 10 million yen or more, for which general competitive bidding is conducted.
(2) Construction contracts with an estimated price of more than 1,300,000 yen and less than 10,000,000 yen, with designated competitive bidding.

Setting method

The standard amount is calculated based on the direct construction cost, common temporary construction cost, site management cost and general management cost, which are the basis for calculating the planned price.

Calculation formula (before revision)
(Base amount) = {(direct construction cost) x 0.97 + (common temporary construction cost) x 0.9 + (site management cost) x 0.9 + (general management cost) x 0.55} x consumption tax rate

Calculation formula (after revision)
(Base amount) = {(direct construction cost) x 0.97 + (common temporary construction cost) x 0.9 + (site management cost) x 0.9 + (general management cost) x 0.68 } x consumption tax rate

If the base amount calculated by the above formula is within the range of 9.2/10 to 7.5/10 of the scheduled price, the base amount will be the minimum limit price.
However, the calculated standard amount is
If it exceeds 9.2/10 of the scheduled price: (minimum limit price) = (scheduled price) x 9.2/10
If it is less than 7.5/10 of the planned price: (minimum limit price) = (planned price) x 7.5/10.

Note: The minimum price limit is not announced at all before bidding.
Note: We will not disclose the breakdown of the design cost, regardless of whether it is before or after the bidding.

Related Links

About introduction of minimum price limit system in consignment to affect construction (internal link)

Inquiries regarding this page

Inagi City General Affairs Department General Affairs Contract Division
2111 Higashi-Naganuma, Inagi-shi, Tokyo
Phone: 042-378-2111 Fax: 042-377-4781

Main text ends here
to the top

Sub navigation from here

Contract/bid information

When you can't find information

Sub-navigation ends here

Below is the footer.
Inagi City's official mascot, Inagi Nashinosuke
2111 Higashinagumanuma, Inagi City, Tokyo 206-8601
Office hours: 8:30 a.m. to 5:00 p.m. Main phone: 042-378-2111 Fax: 042-377-4781
Copyright (C) Inagi City. All rights reserved.
Copyright (C)K.Okawara・Jet Inoue. All rights reserved.
End of footerReturn to top of this page