top of this pagesite menu here
Go to main text of this page
Inagi City
  • site map
  • How to use search
  • Living, procedure
  • Child care/education
  • Health/Welfare/Medical
  • Environment/Garbage/Recycling
  • Tourism/Culture
  • Facility information
  • Municipal information
Site menu here

Text starts here

Application for permission to occupy public property (waterways, non-certified roads, etc.)

Updated: September 1, 2014

Public property permission application procedure

 When occupying, constructing, renovating, or removing structures, adjusting water flow, etc. on the site of public property such as waterways or non-statutory roads (to which the Road Act does not apply), etc. (e.g. building a bridge over a waterway, etc.) Please submit the "Application for Permission to Occupy Public Property" to the city.
Please check the filling instructions when creating the application form.

Points to note when creating an application form

 When applying for permission to occupy public property related to connection to water pipes or sewer pipes, the application form must have the confirmation seal of the facility manager to which the connection will be made in advance.
If you are applying for permission to occupy public property for both water and sewage pipes, you will need to submit separate applications for each, so please complete separate applications.

Change procedure

 If you wish to change the matters for which you have received permission, please submit the "Application for Change of Permit for Occupation of Public Property, etc."

 When renewing the period of permission, please submit the "Application for Renewal of Permit Period for Occupation of Public Property, etc."

succession of status

 Persons who have succeeded to the status of a person who has received permission for occupancy, etc. due to inheritance or merger must submit a ``Status Succession Notification'' to the city within 30 days from the date of succession.

Approval of transfer of rights, lending, collateral

 In principle, a person who has obtained permission for occupancy, etc. cannot transfer, sublease, or collateralize the rights based on the permission for occupancy, etc. to a third party, but in cases where the rights based on the permission are transferred through real estate sales, etc. Please submit the "Application for Approval of Transfer of Rights, etc." form to the city.

Application form

Public property (waterway, non-certified road, etc.) private use style

Available date and time

From 8:30 a.m. to 5:00 p.m. of open agency day

Adobe Acrobat Reader DC (formerly Adobe Reader) is required to open PDF format files.
If you don't have it, you can download it for free from Adobe.
Get Adobe Acrobat Reader DCDownload Adobe Acrobat Reader DC

Inquiries about this page

Inagi City Urban Construction Department Management Section
2111 Higashi Naganuma, Inagi City, Tokyo
Phone: 042-378-2111 Fax: 042-377-4781

End of text
to the top


Below is the footer.
Inagi city official mascot Nashinosuke Inagi
2111 Higashi Naganuma, Inagi City, Tokyo 206-8601
Open agency hours: 8:30 a.m. to 5:00 p.m. Main phone number: 042-378-2111 Fax: 042-377-4781
Copyright (C) Inagi City. All rights reserved.
Copyright (C)K.Okawara・Jet Inoue. All rights reserved.
End of footerReturn to the top of this page