factory approval

Updated: April 1, 2021

Those who are about to set up a factory, or those who have already set up a factory but want to change work methods or machines, are required to comply with environmental ordinances to ensure the health and safety of Tokyo residents (hereinafter referred to as "environmental security ordinances"). ), an application for approval (change) of the factory is required.
In addition, when setting up a factory, please check in advance whether it conforms to other laws and regulations, such as restrictions on the type of industry and work area for each use area stipulated in the Building Standards Act.

plant

(factory definition at the end of this page)

Approval application procedure flow

Documents required for authorization application

  1. "Factory Installation (Change) Approval Application" Form No. 7 No. 1, No. 2
  2. Form No. 7 Attachment 1 Part 1, Part 2, Part 3
  3. Form No. 7 Appendices 2 to 7 (created according to the type of facility and work method)
  4. Attached Catalog
  5. Guide map (within 100 meters area sketch)
  6. Site/Building Layout (Neighborhood Relations Diagram)
  7. Each floor plan (facility layout)
  8. Elevation (North/East/South/West)
  9. work process
  10. Structural drawing of installed machine (catalog, etc.)
  11. Rental contract (only for office rentals)
  12. Industrial waste disposal contract

In addition, there are necessary attached documents depending on the type of factory.

How to prepare an application for authorization

  • When writing by yourself, please write with a ballpoint pen or fountain pen.
  • Please make two copies of the application form, one original and one copy. Copies may be made on copy paper. A copy will be returned with the issuance of the factory authorization.
  • Please refer to the description example for how to fill out and prepare the application form.

Note: Regarding various notification documents, if there is an error in the content of the description due to the abolition of stamping, please correct it with double lines.

commission

1 In the case of setting up a factory Workplace with a total floor area of 500 square meters or less: 8,700 yen per case Workplace with a total floor area of more than 500 square meters and 1,000 square meters or less: 14,200 yen per work floor area Over 1000 square meters: 20,200 yen per item
2 In case of change of factory 7,600 yen per case

When coming to the agency to apply for authorization

Contact the person in charge of the city in advance , and have the factory representative or person in charge come to the office.
Note: A copy of the application form will be returned at a later date. After the examination is completed, the applicant will be asked to visit the agency again and the documents will be returned.

Description example

style

Notification form for soil contamination under the Tokyo Metropolitan Ordinance on Environmental Preservation

From the attached file, you can download the following notification forms No. 30 to No. 33-2, which are subject to Article 116 of the Tokyo Metropolitan Environmental Security Ordinance.

factory definition

Inquiries about this page

Inagi City Urban Environment Development Department Living Environment Division
2111 Higashi Naganuma, Inagi City
Phone: 042-378-2111 Fax: 042-377-4781

End of text
to the top


Below is the footer.
Inagi city official mascot Nashinosuke Inagi
2111 Higashi Naganuma, Inagi City, Tokyo 206-8601
Open agency hours: 8:30 a.m. to 5:00 p.m. Main phone number: 042-378-2111 Fax: 042-377-4781
Copyright (C) Inagi City. All rights reserved.
Copyright (C)K.Okawara・Jet Inoue. All rights reserved.
End of footerReturn to the top of this page