factory approval
Updated: April 1, 2021
Those who are about to set up a factory, or those who have already set up a factory but want to change work methods or machines, are required to comply with environmental ordinances to ensure the health and safety of Tokyo residents (hereinafter referred to as "environmental security ordinances"). ), an application for approval (change) of the factory is required.
In addition, when setting up a factory, please check in advance whether it conforms to other laws and regulations, such as restrictions on the type of industry and work area for each use area stipulated in the Building Standards Act.
plant
(factory definition at the end of this page)
Approval application procedure flow
Documents required for authorization application
- "Factory Installation (Change) Approval Application" Form No. 7 No. 1, No. 2
- Form No. 7 Attachment 1 Part 1, Part 2, Part 3
- Form No. 7 Appendices 2 to 7 (created according to the type of facility and work method)
- Attached Catalog
- Guide map (within 100 meters area sketch)
- Site/Building Layout (Neighborhood Relations Diagram)
- Each floor plan (facility layout)
- Elevation (North/East/South/West)
- work process
- Structural drawing of installed machine (catalog, etc.)
- Rental contract (only for office rentals)
- Industrial waste disposal contract
In addition, there are necessary attached documents depending on the type of factory.
How to prepare an application for authorization
- When writing by yourself, please write with a ballpoint pen or fountain pen.
- Please make two copies of the application form, one original and one copy. Copies may be made on copy paper. A copy will be returned with the issuance of the factory authorization.
- Please refer to the description example for how to fill out and prepare the application form.
Note: Regarding various notification documents, if there is an error in the content of the description due to the abolition of stamping, please correct it with double lines.
commission
1 In the case of setting up a factory Workplace with a total floor area of 500 square meters or less: 8,700 yen per case Workplace with a total floor area of more than 500 square meters and 1,000 square meters or less: 14,200 yen per work floor area Over 1000 square meters: 20,200 yen per item
2 In case of change of factory 7,600 yen per case
When coming to the agency to apply for authorization
Contact the person in charge of the city in advance , and have the factory representative or person in charge come to the office.
Note: A copy of the application form will be returned at a later date. After the examination is completed, the applicant will be asked to visit the agency again and the documents will be returned.
Description example
Description example of factory installation authorization application form (Word: 314KB)
style
Attachment 1 (Regarding Form No. 7) Part 2 [Use, structure, area, etc. by building] (Word: 52KB)
Attachment 1 (Regarding Form No. 7) Part 3 [Facilities such as machines and equipment] (Word: 46KB)
Attached Sheet 5 (Regarding No. 7 Style) Part 2 [Method of wastewater treatment] (Word: 67KB)
Attachment 7 (Form No. 7) [Structure of Groundwater Pumping Facility] (Word: 39KB)
No. 9 style (Article 34 relations) [construction completion notification form] (Word: 31KB)
Form No. 12 (related to Article 37) [Notification of current factory conditions] (Word: 38KB)
No. 13 style (Article 38 relations) [name change notification form] (Word: 33KB)
No. 14 style (Article 39 relations) [abolition notification form] (Word: 33KB)
No. 15 style (Article 40 relations) [notification of succession] (Word: 34KB)
No. 18 style (Article 45 relations) [groundwater pumping quantity report] (Word: 38KB)
Attachment 1 (No. 18 style related) [groundwater pumping record (for statistics)] (Word: 52KB)
Attachment 2 (No. 18 style related) [groundwater pumping record (for each facility)] (Word: 51KB)
No. 19 style (related to Article 46) [Accident notification form] (Word: 39KB)
No. 20 style (related to Article 46) [Accident recurrence prevention measure plan] (Word: 34KB)
No. 22 style (Article 47 relations) [decrease plan such as smoke] (Word: 36KB)
Attached sheet 1 (No. 22 style relations) [decrease plan of soot and smoke] (Word: 37KB)
Attachment 2 (Regarding Form No. 22) [Plan to reduce dust, harmful gases, or bad odors] (Word: 34KB)
Attached sheet 3 (No. 22 style relations) [reduction plan of sewage] (Word: 39KB)
Attachment 4 (Regarding No. 22) [Noise or vibration reduction plan] (Word: 31KB)
Attachment (Form No. 28) [Usage of Properly Controlled Chemical Substances, etc.] (Word: 38KB)
Form No. 29 (related to Article 52) [Chemical Substance Management Procedures] (Word: 36KB)
Attachment (Regarding Form No. 29) [Chemical Substance Management Procedures] (Word: 37KB)
Notification form for soil contamination under the Tokyo Metropolitan Ordinance on Environmental Preservation
From the attached file, you can download the following notification forms No. 30 to No. 33-2, which are subject to Article 116 of the Tokyo Metropolitan Environmental Security Ordinance.
No. 30 style (2 relations of Article 54) [soil groundwater pollution measures plan] (Word: 52KB)
No. 32 style (Article 55 relations) [soil pollution situation investigation report] (Word: 54KB)
No. 33 style (5 relations of Article 56) [pollution diffusion prevention plan] (Word: 53KB)
factory definition
What is a factory? (Word: 35KB)
Inquiries about this page
Inagi City Urban Environment Development Department Living Environment Division
2111 Higashi Naganuma, Inagi City
Phone: 042-378-2111 Fax: 042-377-4781