Procedures under Article 76 of the Land Readjustment Act
The following construction activities within the area of the Land Readjustment Project conducted by the association require the mayor's permission in accordance with Article 76, Paragraph 1 of the Land Readjustment Act.
- Change of Land Characteristics (Cutting and Filling)
- New construction, expansion, and renovation of buildings and structures (fences, retaining walls, garages, etc.)
- Installation or accumulation of items that are not easy to move (over 5 tons)
In addition, an Opinion Statement from each association will be required for the application.
Points to Note
For the "Land Number of the Act" on the Article 76 Application Form, please check with each union office when obtaining the "Provisional Land Certificate" or "Reserved Land Certificate" issued by the union.
If the notation of the "Land Number of the Act" is not uniform, it may affect the building confirmation process.
Starting from April 1, 2022, it will be necessary to present identification documents of the applicant at the time of application and receipt. In the case of corporations, in addition to identification documents, it will be necessary to present documents that indicate affiliation (such as employee ID cards, business cards, etc.).
In conjunction with this, it will no longer be necessary to affix a seal in the applicant and representative sections of the Article 76 application form.
Flow of Permission Application
For the "land number of the act" on the Article 76 permit application form, please confirm at each union office when obtaining the "provisional land certificate" or "reserved land certificate" issued by the union.
If the notation of the "land number of the act" is not unified, it may affect the building confirmation process.
The flow of the permit application process and the documents to be attached to the Application Form are summarized in a leaflet. Please make use of it.
Number of Copies Submitted
Inquiry of opinions to each association 2 copies (1 original, 1 duplicate)
Application for permission under Article 76 of the Land Readjustment Project Act 2 copies (1 original, 1 duplicate)
Application Form Attachment Documents
Buildings Requiring Construction Confirmation
For documents 6 to 12, the basic principle is to use the documents for building confirmation application.
Opinion Inquiry to Each Association requires documents 2, 3, and 5 to 12, while Article 76 Permission Application requires documents 1 and 3 to 12 to be attached.
- Application Form
- Opinion Statement Issuance Request
- Power of Attorney (specifying the contents related to the procedures of the Land Readjustment Project, Article 76 of the Land Readjustment Act)
- Opinion Statement of the Implementer
- Copy of provisional land exchange certificate or reserved land certificate, or both
- Building Confirmation Application Form (From the Second Page to the Fifth Page)
- Guide Map
- Site Plan [Scale 1:500 or larger]
- Floor plan of each floor [Scale 1:200 or larger]
- Elevation drawing (two or more sides) [scale 1:200 or larger]
- Cross-sectional view (two or more sides) [scale 1:200 or larger]
- Documents showing the basis for the area of the site and buildings
Structures Requiring Building Confirmation
Inquiry of Opinions to Each Association requires the documents from 2, 3, and 5 to 9, and the Article 76 Application Form requires the documents from 1 and 3 to 9 to be attached.
- Application Form
- Opinion Statement Issuance Request
- Power of Attorney (specifying the contents related to the procedures of the Land Readjustment Project, Article 76 of the Land Readjustment Act)
- Opinion Statement of the Implementer
- Copy of provisional land exchange certificate or reserved land certificate, or both
- Guide Map
- Floor Plan
- Cross-sectional view
- Other structural diagrams and more
Note: This document will clarify the relocation or new installation of pipe diameter, pipe material, soil cover, position, etc. The same applies to structures, retaining walls, etc.
Activities that do not require permission
Among the construction activities that do not require building confirmation, the following actions that are recognized as not likely to hinder the implementation of the business will have their procedures omitted. Additionally, the relocation of structures carried out at the request of the business operators is not subject to this procedure.
Furthermore, for actions other than those listed below, decisions will be made based on their content, so please consult with the business operators (each association) in advance.
- Repairs and renovations that do not require building confirmation for buildings and designated structures
- Installation of gas, electricity, telephone, water, and sewerage service lines associated with construction work
- Actions agreed upon with the future road manager specified in the business plan for road structures within the road
- In cases where procedures equivalent to Article 76 of the Land Readjustment Act are carried out, such as entering into implementation agreements for urban planning projects other than the relevant project (limited to cases not involving building confirmation)
Contact Information for Each Land Readjustment Project Association
Nanzan East Land Readjustment Project Association
Address: 1462-1 Momura, Inagi City
Phone: 042-378-5773
Chairman: Toshiyuki Mori
Related Forms
- Construction Start Notification (Word 29.0KB)
- Construction Completion Notification (Word 28.0KB)
- Opinion Statement Issuance Request Form (Word 40.0KB)
Construction Start Notification, Construction Completion Notification, Opinion Statement Issuance Request
Please apply at each union office for more information.
To view the PDF file, you need "Adobe(R) Reader(R)". If you do not have it, please download it for free from Adobe Systems' website (new window).
Please let us know your feedback on how to make our website better.
Inquiries about this page
Inagi City Urban Environment Management Department Land Readjustment Division
〒206-8601 Tokyo, Inagi City, Higashi-Naganuma 2111
Phone number: 042-378-2111 Fax number: 042-378-9719
Contact Inagi City Urban Environment Management Department Land Readjustment Division