Regarding the maintenance of the Minami-Tama-one trunk line
Update date: January 19, 2022
The Minami-Tama One Trunk Line is an urban planning road with a length of approximately 16.6 kilometers that connects from Tamagawara Bridge in Chofu City to Machida Kaido in Machida City via Inagi City, Tama City, and Hachioji City.
October 27, 2021 Regarding the Minami-Tama One Trunk Line (from Hyakumura, Inagi City to Hijirigaoka 5-chome, Tama City) project (Constructed by Tokyo Metropolitan Government)
The Tokyo Metropolitan Government has obtained urban planning road business approval from the Ministry of Land, Infrastructure, Transport and Tourism for Tama City Planning Roads 3, 1, and 6 Minami Tama One Trunk Line (from Hyakumura, Inagi City to Hijirigaoka 5-chome, Tama City), It was announced on the 30th of the month.
In order to prevent the spread of the new coronavirus infection, the Tokyo Metropolitan Government will not hold a briefing session to explain the business overview, but will hold a written explanation using the explanation materials linked below (distributed on October 27, 2021). Masu.
(Tokyo Metropolitan Government Press Release) Project Starts (July 30, 2021)
February 2015 Regarding the formulation of “Minamitama Ridge Trunk Line Development Policy”
The Minami-Tama One Trunk Line was established as a city plan in 1964 in line with the development of Tama New Town, and although some sections have been constructed with four lanes, the majority of the line has provisional two lanes. Chronic traffic congestion is occurring, and traffic flows onto community roads, causing deterioration of the roadside environment.
Based on its role as a wide-area arterial road network, the Tokyo Metropolitan Government is proceeding with consideration of the form of construction of provisional two-lane sections, and in February 2015, it has decided to develop a development policy that includes four lanes for the entire line and a planar structure for sections with cut-out structures. It was formulated in February.
Basic concept : The entire line will be 4 lanes in order to alleviate traffic congestion and ensure wide-area trunk road functionality.
・A planar structure will be adopted for reasons such as access to the roadside and integration with town planning.
- Make effective use of the current road land and create a road configuration that is considerate of the roadside environment.
・A tunnel structure will be used near the city limits of Inagi City and Tama City, and a route will be considered that takes into account conservation areas.
(Conservation areas are areas designated based on the Tokyo Nature Protection and Restoration Ordinance)
Explanation slide (PDF: 5,722KB)
To open PDF files, you need Adobe Acrobat Reader DC (formerly Adobe Reader).
If you don't have it, you can download it for free from Adobe.
Download Adobe Acrobat Reader DC
Inquiries about this page
Inagi City Urban Construction Department Town Development Planning Division
2111 Higashi-Naganuma, Inagi-shi, Tokyo
Phone: 042-378-2111 Fax: 042-378-9719