Permission under Article 53 of the City Planning Act
Updated: August 18, 2021
Permission from the mayor is required for building activities within the area of urban development projects (Sakahama Hirao Land Readjustment Project) before city planning facilities and projects.
Criteria for permission stipulated in Article 54 of the City Planning Act
- The number of floors shall be 2 or less, and there shall be no basement.
- The main structure shall be wooden, steel frame, concrete block or similar structure.
However, regarding city planning roads, parks, and green spaces that have not yet been started, there is a relaxation of permission standards for three-story buildings, etc.
See below for details.
Application documents
Permission application form for Article 53, Paragraph 1 of the City Planning Act (Word: 47KB)
From January 1, 2021, it is no longer necessary to seal the application form and power of attorney.
Please attach the following to the application form and submit two copies . Processing time is approximately one week.
1 Building confirmation application form (pages 2 to 5)
2 Guide map (1/2,500 scale or more)
3 Layout plan (1/500 scale or more)
4 Quadrature diagram (site/building)
5 Floor plan of each floor (1/200 scale or more)
6 Elevation view (2 or more, scale of 1/200 or more)
7 Sectional view (2 or more, scale of 1/200 or more)
Please attach a power of attorney if necessary. The style is optional.
Adobe Acrobat Reader DC (formerly Adobe Reader) is required to open PDF format files.
If you don't have it, you can download it for free from Adobe.
Download Adobe Acrobat Reader DC
Inquiries about this page
Inagi City Urban Construction Department Town Development Planning Division
2111 Higashi Naganuma, Inagi City, Tokyo
Phone: 042-378-2111 Fax: 042-378-9719