This is the top of the pageSite menu here
Go to the main text of this page
Inagi City
  • site map
  • How to use search
  • Living/procedures
  • Childcare and Education
  • Health/welfare/medical care
  • Environment/Trash/Recycling
  • Tourism/Culture
  • Facility Guide
  • Municipal administration information
Site menu ends here

Main text starts here

About assistance for creating hedges

Update date: June 18, 2021

Target of subsidy grant

 If all of the following apply, you will be eligible for a subsidy.
1 Installation of new hedges within the city <br id="4"/>Notes: Including removing existing block walls and converting them into hedges.
2 The height of hedge trees must be approximately 80 cm or more.
3 The total length of the hedge is 3 meters or more
4 Facing the road, in principle, the road width must be at least 4 meters.
Note 1: When installing a hedge alongside a net fence, etc., as a general rule, the trees should be planted on the road side and the height of the tree should be higher than the net fence. However, when installing a net fence facing the road, the structure should have good transparency, and the trees to be planted should be higher than the net fence when planted.

Note 2: Be sure to apply before starting construction, and start construction after the city has decided to issue it. This does not apply during construction or after construction is completed. For details, please contact the Town Development and Revitalization Division.

Subsidy amount

Installation of hedges (new installation)
8,000 yen per meter
Demolition (removal) of block walls, etc. for the purpose of installing hedges
5,000 yen per meter
Note 1: The grant applies to up to 30 meters for both new construction and removal.
Note 2: If the new installation cost is less than 8,000 yen per meter and the removal cost is less than 5,000 yen per meter, the actual cost (rounded down to the nearest 100 yen) will be the subsidy amount.

Exemption from subsidy application

1. Those carried out by the national government, local governments, public corporations and public agencies
2. Business conducted by real estate agents and developers
3. Any other matter that the Mayor deems inappropriate

Inquiries regarding this page

Inagi City Urban Construction Department Town Development and Revitalization Division
2111 Higashi-Naganuma, Inagi-shi, Tokyo
Phone: 042-378-2111 Fax: 042-378-9719

End of main text
to the top


Below is the footer.
Inagi City official character Inagi Shinanosuke
2111 Higashinagumanuma, Inagi City, Tokyo 206-8601
Opening hours: 8:30am to 5:00pm Main phone number: 042-378-2111 Fax number: 042-377-4781
Copyright (C) Inagi City. All rights reserved.
Copyright (C)K.Okawara・Jet Inoue. All rights reserved.
End of footerReturn to top of this page