Restrictions on groundwater pumping

Last updated: April 1, 2021

In order to prevent ground subsidence, when installing groundwater pumping facilities (wells), the Tokyo Metropolitan Environmental Ordinance (abbreviation: Tokyo Environmental Preservation Ordinance) requires structural standards and upper limits on the amount of water pumped. is regulated.
In addition, the amount of pumped water, including groundwater pumping facilities that have already been installed, must be reported once a year.

Installation of groundwater pumping facility (well)

Target facilities

All pumping facilities
Note: For single-family homes used only for household purposes, only pumped water facilities with a pump output of over 300 watts are eligible.

Structural standards and pumping regulations

Cross-sectional area of ​​discharge port Strainer position Pumping machine output Upper limit of pumping capacity
6 square centimeters or less No limit 2.2 kilowatts or less Average of 10 cubic meters per day
up to 20 cubic meters per day
more than 6 square centimeters
21 square centimeters or less
Deeper than 400 meters No limit
Over 21 square centimeters Cannot be installed

Notification period

Please submit the installation notification at least 30 days before the start of construction.
Note: When coming to report, please contact the Living Environment Division Environmental Conservation Section in advance.
Note: In principle, a copy of the notification form will be returned at a later date. If it is difficult to come to the office to return the item, it will be returned by mail, so if you wish to have it sent by mail, please attach a self-addressed envelope with the necessary stamps when submitting the notification.
Note: Regarding various notification documents, if there is an error in the written contents due to the abolishment of seals, please correct them using double lines, etc.

Documents required for notification

Number of copies submitted

One original and one copy (including attached documents)

Change/abolition of groundwater pumping facilities (wells)

When changing or abolishing a pumping facility, please notify if there is a change in the owner's name, address, etc.

Groundwater pumping amount report

Pumping facility installers should keep track of the amount of groundwater pumped in the previous year, etc., and submit a report once a year.

Target facilities

Note for all pumping facilities: For pumping facilities installed after July 2016 that are used only for domestic purposes in single-family homes, only pumping facilities with a pump output of over 300 watts are eligible.

Reporting period

Between January 1st and December 31st of the previous year

contents of report

Monthly groundwater pumping volume, breakdown by use, etc.

Documents to be submitted

Groundwater pumping amount report (Form No. 18)

Submission period

Every year until the end of January

Number of copies submitted

2nd part

Style

Example