top of this pagesite menu here
Go to main text of this page
Inagi City
  • site map
  • How to use search
  • Living, procedure
  • Child care/education
  • Health/Welfare/Medical
  • Environment/Garbage/Recycling
  • Tourism/Culture
  • Facility information
  • Municipal information
Site menu here

Text starts here

We are changing the procedure for starting to use the sewerage system!!

Updated: October 2, 2024

1 Before change

Sewerage fees are incurred by submitting a notification of commencement of public sewerage use stating that you are using the sewerage system.

2 After changes

[When you start using water: Complete the procedure at the Tokyo Metropolitan Government Waterworks Bureau Tama Service Station]
For all newly installed meters, sewerage charges will be incurred as soon as water supply begins.
However, the following cases for newly installed meters are excluded:

  1. For fields
  2. Sprinkler valve (Excluding temporary sprinklers for construction work. If you wish to suspend sewerage charges for temporary sprinklers for construction work, please submit a notification of commencement of use of the public sewerage system to the Inagi City Sewerage Division. You can apply for the notification of commencement of use of the public sewerage system online from the link below.)
  3. Shared faucet
  4. Outside the area where sewerage service has started

[Notification to the City Sewerage Division]
For the time being, whether you have a new meter or an existing meter, please continue to submit a notification of commencement of use of the public sewer system when submitting the notification of completion of drainage facility construction (promptly after connecting to the public sewer system). There is no change to the requirement to submit this form.
If the sewer connection status is different from when you started using water, please promptly submit a notification of start of use of public sewer to the Sewerage Division. (For example, connecting a shared tap to the public sewer.)

For existing meters, sewerage charges will be incurred as usual by submitting a public sewerage service start notification form stating that sewerage is in use.
If you have any further questions, please contact the Sewerage Division.

Link to external site Opens in a new window.LoGo form “Notification form for commencing use of public sewerage, etc.” (external link)

3. Background to the change

Currently, the sewerage treatment population in Inagi City is over 99%, and considering that the majority of newly installed meters are being connected to the sewer system, we will be changing the procedure for starting to use the sewer system.

4. Time of change

The change will take effect on September 1, 2024.

5. Other

Regarding starting to use the sewerage system, procedures are mainly carried out by designated sewerage construction companies at the time of construction work, so residents living in Inagi City do not need to go through any procedures to start using the sewerage system when they move or relocate.

6. Frequently Asked Questions (FAQ)

(1) What changes have been made with the recent changes to the method of notifying sewerage (start of use)?

For all newly installed meters, sewerage charges will be incurred as soon as water supply starts. However, for (1) fields, (2) sprinkler taps (excluding temporary sprinkler use during construction), (3) common taps, and (4) areas outside of sewerage service start areas, we will treat them as not having sewerage, so please inform the Tokyo Metropolitan Government Waterworks Bureau Tama Service Station. If the sewerage connection status is different when water use starts, please submit a public sewerage use start notification form to the city.

(2) Do I still need to submit a notification of commencement of public sewerage use even after the procedures for commencing sewerage use have changed?

For the time being, please continue to submit the form when submitting the drainage facility construction completion notification (promptly after connecting to the public sewer system) as usual. If there are any changes in the future, we will contact you separately.

(3) Is the change just to the installation of new meters?

Only for new meters. For existing meters, sewerage charges will be incurred as usual based on the notification of commencement of public sewerage use, etc. In addition, for suspended, discontinued, resumed, and unused meters, administrative procedures will be carried out by submitting a notification of commencement of public sewerage use, etc.

(4) In the case of an apartment building, one tap will be put into service first, and the meters for the remaining rooms will be used once the rooms are created. Do new residents need to go through the process of starting up the services themselves?

No, there is no need for individuals to take any further action. If you have a new meter, sewerage charges will start as soon as water supply starts. Regardless of whether your meter is new or existing, you will need to submit a notification of start of use of the public sewerage system to a designated sewerage contractor as soon as possible after connecting to the public sewerage system, just as before.

(5) It is troublesome to submit a notification of commencement of use of public sewerage system even though I do not intend to use the sewerage system.

We apologize for the inconvenience, but we would appreciate your cooperation as you can also apply online.

(6) During the construction work, we will not connect to the sewer system and will only water the house. How can we avoid being charged for sewerage?

Please submit the Public Sewerage Service Start Notification Form without using it. It may be difficult to retroactively process the Public Sewerage Service Start Notification Form, so we will generally process it from the date of submission. Please do not forget to submit it. In addition, the Public Sewerage Service Start Notification Form can also be submitted electronically, so please make use of this.

Inquiries about this page

Inagi City Urban Environment Improvement Department Sewerage Division
2111 Higashi Naganuma, Inagi City, Tokyo
Phone: 042-378-2111 Fax: 042-378-9719

End of text
to the top


Below is the footer.
Inagi city official mascot Nashinosuke Inagi
2111 Higashi Naganuma, Inagi City, Tokyo 206-8601
Open agency hours: 8:30 a.m. to 5:00 p.m. Main phone number: 042-378-2111 Fax: 042-377-4781
Copyright (C) Inagi City. All rights reserved.
Copyright (C)K.Okawara・Jet Inoue. All rights reserved.
End of footerReturn to the top of this page