8. Construction, house, gas, water supply
Updated: May 12, 2008
8.Construction, house, gas, water supply (PDF: 182KB)
1 construction
Table 139
Road rate of city road and pavement rate (Excel: 17KB)
Table 140
Number of bridges, bridge length and bridge area (Excel: 15KB)
Table 141
Number of parks and area (Excel: 16KB)
Table 142
Extension and area of municipal roads by width (Excel: 22KB)
Table 143
The situation (Excel: 19KB) of roadside tree
2 houses
Table 144
The situation (Excel: 20KB) of house
Table 145
The situation (Excel: 21KB) of wooden house (house targeted for evaluation)
Table 146
Status of non-wooden houses (houses targeted for evaluation) (Excel: 21KB)
Table 147
The situation of construction start building according to structure (Excel: 26KB)
Table 148
Changes in the number of housing starts (Excel: 24KB)
Table 149
Changes in the number of public rental housing units (Excel: 25KB)
Table 150
Transition of lost buildings (Excel: 19KB)
Table 151
3 gas
Table 152
Changes in the number of gas pipe extensions and the number of customers (Excel: 19KB)
Table 153
Changes in city gas sales volume (Excel: 20KB)
4 water supply
Table 154
The water supply spread situation (Excel: 22KB)
Table 155
The water distribution situation (Excel: 23KB)
Adobe Acrobat Reader DC (formerly Adobe Reader) is required to open PDF format files.
If you don't have it, you can download it for free from Adobe.
Download Adobe Acrobat Reader DC
Inquiries about this page
Inagi City General Affairs Department General Affairs and Contract Section
2111 Higashi Naganuma, Inagi City, Tokyo
Phone: 042-378-2111 Fax: 042-377-4781
![End of text](/en/images/spacer.gif)