Sewer related
Updated: December 26, 2024
Note: The forms for public sewerage facility self-financed construction, drainage facilities, and water quality have been changed. In addition, to streamline the designated sewerage construction contractor application process, we have opened an online form for checking submitted documents in advance. (January 2025)
- Please print out the PDF file for use.
- Plain paper and A4 print size are recommended.
- Thermal paper for thermal printers cannot be accepted.
Self-financed work related to public sewerage facilities
It usually takes about a week for permission to be granted, but depending on the content it may take more than a month, so please apply well in advance.
Flow (PDF: 66KB) of public sewer facility own expense construction application
Application form for self-financed construction of public sewerage facilities (sample) (PDF: 260KB)
Application for Public Sewerage Facility Self-Funded Construction (PDF: 173KB)
Application for Public Sewerage Facility Self-Funded Construction (Word: 33KB)
- Please make sure to submit the "Public Sewerage Facility Self-Funded Construction Application Form" printed double-sided.
Basket/mounting pipe correction template
- Please submit the manhole/installation pipe correction template along with the self-financed construction completion notification.
Basket / Mounting pipe correction template (PDF) (PDF: 70KB)
Basket/mounting pipe correction template (Excel) (Excel: 14KB)
In case of work involving exclusive use of metropolitan roads
If the work involves occupying a prefectural road, please read "Regarding Work on Occupying a Prefectural Road" and submit a "Road Occupation Procedure Authorization Form."
In metropolitan road private use construction (PDF: 124KB)
Road occupation procedure power of attorney (Word: 33KB)
Application for installation of public squares
Public masu setting application (PDF: 177KB)
Public masu setting application (Word: 113KB)
- Please make sure to submit the "Public Manhole Installation Application Form" printed double-sided.
Application related to designated sewer construction shop
Designated Sewerage Construction Company Various Application and Notification Guide (PDF: 165KB)
Designated Sewerage Construction Company Application and Notification Forms (PDF: 176KB)
Designated Sewerage Construction Company Application and Notification Forms (Word: 38KB)
- For new applications, renewal applications, and changes (excluding some procedures described below), we will check your documents in advance, so please submit electronic data using the online form below. Please note that there is no pre-screening for applications only for changes to the designated construction company's telephone number, or for cancellations or suspensions, so please submit directly to the counter.
- Please refer to the "Inagi City Designated Sewerage Construction Contractor Application and Notification Guide" for the procedure and necessary documents to be submitted.
[New/renewal applications] Pre-screening of documents is available here (external link)
- This form allows you to submit data in PDF (scans of documents, etc.) or JPEG (photos of the documents you are submitting, etc.) format.
Public sewer beds, etc. Private occupancy permission application relationship
Application for permission to occupy public sewerage systems (PDF: 137KB)
Private use permission application relations (Word: 68KB) such as public sewer beds
water quality
Installation handling summary (PDF: 150KB) of "disposer wastewater treatment systems"
Disposer wastewater treatment system report relations (PDF: 212KB)
- When installing a disposer, be sure to check the "Installation and Handling Guidelines for Disposer Drainage Treatment Systems, etc."
- In Inagi City, only products certified based on the "Performance Standards for Disposer Wastewater Treatment Systems for Sewerage Systems (Draft) (March 2013)" created by the Japan Sewage Works Association are permitted for new installations.
Drainage equipment
We hand plan confirmation applications such as drainage facilities to the planned number of construction at sewerage section window.
Notification of completion of drainage equipment construction (PDF: 131KB)
Notification of completion of drainage equipment construction (Word: 55KB)
Application for reading of drainage facility completion drawing (PDF: 107KB)
Power of attorney (PDF: 81KB) such as drainage facility completion drawing reading
- Please use this application form and the power of attorney for viewing the completed drawing of drainage facilities at the Sewerage Division.
Notification of commencement of use of public sewerage system (PDF: 207KB)
Notification of commencement of use of public sewerage system (Word: 105KB)
- If you print the Public Sewerage Service Start Notification Form double-sided, the Multiple Household/Apartment Building Water Number List will be printed on the back of the Public Sewerage Service Start Notification Form. If there are two or more water meters (apartment building, two-family home, etc.), please fill in the Multiple Household/Apartment Building Water Number List for all meters located at the installation location.
[Example: At the time of start] Notification of start of use of public sewerage (PDF: 213KB)
You can apply using the form below.
LoGo form “Notification form for commencing use of public sewerage, etc.” (external link)
Sewerage charges
Sewerage fee exemption application (PDF: 200KB)
You can apply using the form below.
LoGo form “Sewerage fee exemption application form” (external link)
Adobe Acrobat Reader DC (formerly Adobe Reader) is required to open PDF files.
If you don't have it, you can download it for free from Adobe.
Download Adobe Acrobat Reader DC
Inquiries regarding this page
Inagi City Urban Environment Development Department Sewerage Division
2111 Higashi-Naganuma, Inagi-shi, Tokyo
Phone: 042-378-2111 Fax: 042-378-9719